Our approach, developed over decades of experience, is fine-tuned to get the results you want.
We deliver concept-to-completion solutions, designed by temporary power specialists with access to the largest inventory of high-quality power generation and distribution equipment in North America.
From a wide range of diesel and natural gas generators to transformers, cable, light towers and more, our large rental fleet and extensive vendor network ensure we’ll have the temporary power equipment that your project requires — every time.
For nearly 20 years, we have been at work powering projects across Canada’s industrial sectors.
Select from this sampling of industries to learn how we can put our expertise to work for you.
VIEW ALLFrom our inception in 1998, we have been building our team on a foundation of excellence. Our team members’ passion, expertise and commitment are what have allowed us to grow into a national company with projects across Canada.
Click on the links to learn more about our history, our team or our career opportunities.
When a large oil refinery schedules a shutdown, they don’t play games. Scale, efficiency, and crucially, speed, are all vital pieces of the complex puzzle. Powering that kind of shutdown is equally complex — and the Trinity team is always up to the challenge.
With over 80 years in operation, our client, a well-established oil refinery, has made an art of refining crude and synthetic oil into a wide variety of end-user products, including gasoline, diesel, jet fuel and more.
To conduct a successful, large-scale shutdown, the refinery had identified several equipment requirements: with up to 300 workers on site, congestion was a big factor so a large number of transformers and panels with lots of receptacles that could fit into small spaces were required; the equipment had to be outdoor rated, with rugged frames that could handle being moved around; and, as is often the case, out client had a tight timeline for acquiring the necessary equipment.
With the list of exacting requirements, the Trinity team got to work sourcing the equipment from our vast fleet, and making the modifications that were needed to ensure it met our client’s specific requirements.
As the project progressed, and our client’s equipment needs grew, we were able to supply the additional equipment as well.
In the end, we supplied 11 I-line panels from 1200A to 3000A, 14 standup panels from 100A to 400A, 14 200A and 400A adjustable trip I-line breakers, 70 I-line breakers from 30A to 200A and five 30 to 75kVA 480V-120/208V isolation transformers, each with 60A primary disconnects mounted on the frame.
The equipment Trinity provided was weather-proof and allowed for our client to move it around the site easily with a forklift. It was also compact enough to fit in high-traffic areas without creating a tripping hazard.
Most importantly, it was customized to the refinery’s unique specifications and delivered on time to allow the shutdown to progress on schedule.