Our approach, developed over decades of experience, is fine-tuned to get the results you want.
We deliver concept-to-completion solutions, designed by temporary power specialists with access to the largest inventory of high-quality power generation and distribution equipment in North America.
From a wide range of diesel and natural gas generators to transformers, cable, light towers and more, our large rental fleet and extensive vendor network ensure we’ll have the temporary power equipment that your project requires — every time.
For nearly 20 years, we have been at work powering projects across Canada’s industrial sectors.
Select from this sampling of industries to learn how we can put our expertise to work for you.
VIEW ALLFrom our inception in 1998, we have been building our team on a foundation of excellence. Our team members’ passion, expertise and commitment are what have allowed us to grow into a national company with projects across Canada.
Click on the links to learn more about our history, our team or our career opportunities.
Lightning may not strike twice, but for some of our clients, projects can recur, which means that their temporary power needs do as well.
This is why Trinity teams keep detailed and meticulous documentation throughout a project’s lifespan. Not only does this lead to smooth and efficient project flow, it also sets our clients up for even quicker and easier projects down the road.
A recent situation with a return client highlights how effective this process can be.
For over 20 years, this client has been one of Western Canada’s leaders in safely and responsibly operating complex energy processing facilities. They provide essential services for the oil and gas industry, including natural gas gathering and processing, natural gas liquids fractionation, transportation and storage.
Having worked with Trinity Power on several previous projects, this client had already experienced our High Touch, High Care approach, and had been very happy with the results. In fact, they were so happy with the outcome of one particular project that they wanted us to replicate it exactly, with the precise equipment we had provided twice previously.
Needing to power a laydown area that included office trailers, lunch trailers, a warehouse and a fabrication tent, the client required a 125kW natural gas generator to use as a primary power source until power lines were installed. They also needed a backup 125kW natural gas generator on site to prevent any downtime that would result if the primary unit went down.
Having completed the project for this client twice before, we were able to use the information we had gleaned during the previous projects to skip ahead several steps.
We quickly located the same equipment, from the same vendors. Because of our excellent relationships with our vendors we were also able to negotiate the same costs for the equipment.
Thanks to our rigorous documentation, and the relationships that Trinity has built with both vendors and clients, we were able to spare our client going to tender, saving them man hours and resources, while also getting them the best possible pricing on the equipment they needed.
The result was a third successful project, proceeding on time, on budget and with the best equipment for the job.
Our quick response ensured that one of our clients was able to serve their client with speed and efficiency.
Flooding damaged the electrical room of a high rise. Discover how we helped.