Our approach, developed over decades of experience, is fine-tuned to get the results you want.
We deliver concept-to-completion solutions, designed by temporary power specialists with access to the largest inventory of high-quality power generation and distribution equipment in North America.
From a wide range of diesel and natural gas generators to transformers, cable, light towers and more, our large rental fleet and extensive vendor network ensure we’ll have the temporary power equipment that your project requires — every time.
For nearly 20 years, we have been at work powering projects across Canada’s industrial sectors.
Select from this sampling of industries to learn how we can put our expertise to work for you.
VIEW ALLFrom our inception in 1998, we have been building our team on a foundation of excellence. Our team members’ passion, expertise and commitment are what have allowed us to grow into a national company with projects across Canada.
Click on the links to learn more about our history, our team or our career opportunities.
After years of heated debate over the economic benefits and environmental impact of Site C, the final structure of a system of three dams on the Peace River initially proposed in the 1950s, the project has finally received a green light. On December 16, the Energy Minister Bill Bennett announced that the $8.8 billion construction project is to commence next summer. The completed hydroelectric plant is expected to satisfy the steep increase in energy demand in BC by providing low-cost, clean energy for generations to come, while maintaining a minimal footprint.
The project consists of a 9,330 hectares (5,570 of which is flooded land) earthfill dam, which will complete the system of Sites A and B, both on the Peace River, to provide the most efficient and least environmentally harmful energy generation to British Columbia. Site C is designed to produce a total capacity of 1,100 MW, which is expected to satisfy more than half of the growing energy demand in the province in the following 40 years.
The project, which will enter its construction phase in mid-2015, consists of several components. The three major structures comprising Site C will be a 1,050-meter long earthfill dam, a power generation station, and an 83-kilometer reservoir. In addition, several segments of Highway 29 will be realigned to accommodate the project, two new transmission lines will be built as an extension to already existing right-of-way to connect the new station with the Peace Canyon Substation, and measures will be taken to preserve the Hudson’s Hope shoreline. Finally, the project will utilize newly built temporary access bridges and roads, as well as accommodation units for the on-site workers involved in the project.
The start of the Site C project construction next year promises to be extremely lucrative for the surrounding areas. Initial calculations show that 10,000 person-years of employment will be available to local contractors and subcontractors only during the 7-year construction stage, with a total of 33,000 for the entire length of the project.
Site C’s own engineering team will be involved in the design of the major earthworks, such as excavation work, river diversion, dam and concrete buttress construction, site drainage, road construction, etc., but they will be executed by qualified contractors. The bidding process is already open to candidates who can demonstrate successful delivery on similar-sized projects and can commit to completing all works until 2022. The main civil works contract will be awarded in the summer of 2015.
From then on, the main contractor will be responsible for the hiring process of subcontractors. Once the main civil contractor is officially announced, detailed job descriptions, requirements and application forms will be listed on the project’s official website. Among the job openings at Site C are mechanics, welders, heavy-duty equipment operators, electricians, cement masons, construction supervisors, construction labourers and many more.
With a $3.2 billion increase in BC’s GDP only during the construction phase of the Site C project, the next seven years will surely be a lucrative period for the Peace River region contractors and subcontractors. For more information on the project and for job opportunity updates, head over to the projects official website.